Thursday, December 13, 2012

House in Merida

Finally, some real updates on the construction. The pasta tile floors are going in now, but it is a bit of a logistical nightmare for the workers, as there is only one way in and out of the house. The pool walls are being formed, the plastering is almost done, and the plumbing/electrical is underway....good times.



shower / skylight
concrete tiles (pasta)

pool walls

shower


Looking to back through kitchen

Looking forward to kitchen/patio



forming the bathroom vanity

Tile moving along fast


Wednesday, December 12, 2012

House in Merida

A few newer photos showing some of the roof details and interiors. Hopefully some more photos to come soon before we visit over the holidays.

Bedroom window got smaller

Bathroom skylight over shower

Tall ceilings in bathrooms (13'-0")

Skylights from roof

Smaller bedroom window

Concrete upstand for water control (not the elegant thin floating roof I imagined)